Vision Building-a Sure Way to Facilitate Sustainable institutions for the Poor
17
The demand for a scheme has to be
Challenges
substantial or material procurement will
Dhruva has faced and continues to face
be expensive. The possibility of providing
many challenges over the years of
funds for these needs of the people is
implementation. Some of the challenges
being examined.
were due to the programme design
adopted and some due to the area of
In the case of loans for livestock, it is best
operation.
if the concerned farmer/GVM is directly
involved in the purchase. For micro
1.
Credit in kind
enterprises -- small shops -- cheques
were issued to a particular supplier from
One of the main highlights of the
where the shop owner was to collect
programme was also the cause of many
material. But often, material was to be
challenges, ranging from procurement,
collected from multiple locations,
distribution to fund management.
creating problems. Hence for livestock
Material purchase: Dhruva has stringent
and micro enterprise schemes, cheques
purchase procedures. This often resulted
are isued to the farmer/GVM i.e., credit is
in delays in credit disbursement. To
not in kind. But the end use of these loans
overcome this, the major products in
has to be very closely monitored.
demand were identified, quality
manufacturers were listed, rates were
2.
Tribal area
fixed and on receiving applications, the
Some of the challenges which Dhruva
material was easily and quickly sourced
faced were due to the remote and
by Dhruva.
scattered area of operation. The villages
are spread over a large area. Travel in
In addition, the loan committee regularly
the area is difficult both due to the lack
followed up with the purchase
of transportation facilities and the bad
committee and ensured that there were
condition of the roads. Most of the
no pending requisitions. A representative
villages do not have regular electricity
from the programme office was also
nor
are
they
linked
to
the
nominated to the purchase committee
telecommunications network. Hence,
to ensure there were no other
planning for capacity building, record
bottlenecks.
checking or any activity requires huge
The quality of inputs is also an important
effort in terms of taking the message to
issue as credit is involved and there
the concerned persons. All plans have
should be no excuse for defaults. Hence
to be made well in advance to ensure
only standard, certified products are
that information reaches in time, as
sourced.
changes cannot be made easily.
Literacy levels are also very low and
Material Distribution: All transactions
hence a hindrance to calculation of
related to credit are handled from one
interest, instalments due, etc.
In addition, the
programme office. Given the spread of
loan committee
the area of operation, distribution to
There
are
many
Transparency:
regularly followed
each village is not possible as the
misconceptions among the people
up with the
transaction cost would be huge. Hence
about credit. Some believe that credit
purchase
the material had to be collected from
is available only at very high rates, are
committee and
the programme office, often resulting in
worried that they will be exploited and
ensured that there
delays in the material being received by
are not confident of being able to repay
were no pending
the participant. The programme office
the loan. This is based to some extent on
requisitions
was easily accessible only to some GVMs,
their past experiences. The village-level
for others, a godown was rented at a
Hisabnis is very important in ensuring
central location from where material
transparency in all dealings and in
could be collected on a specific day of
generating confidence among the GVM
the week. Additionally, once a week,
members. Tremendous effort goes into
material was delivered to the
building the capacities of the Hisabnis.
cooperative offices which were more
Given the level of literacy and the
accessible to the GVMs.
responsibilities to be shouldered at the
GVM level, developing a Hisabnis
Fund management: The requirement of
capable of maintaining the accounts,
a specific material might be around five
handling funds of the GVM etc., is a
units, but to make the transportation and
continuous effort requiring various types
other processing costs viable, about 10
of training with support from the Field
units are purchased. The extra material
teams. There is also a turnover in
purchased might not have immediate
Hisabnis, necessitating additional
demand, resulting in borrowed funds
capacity building efforts.
beings blocked without earning any
income.
Awareness: To increase awareness of
SVY, leaflets giving details of the schemes
Limitation in credit schemes: The people's
have been prepared and distributed,
demands are varied, but they often
Credit fairs were held where the people
cannot be met, as there might be no
from the nearby villages were able to
credit schemes designed for these needs.