Theme- Micro-Finance & Technology
main tests i.e., the load test and
Many times higher management
boundary test. Such software often
may want to automate but lower
fails when there is increase in load
functionaries might resist for fear of
and boundary -- inappropriate
mistakes  being  revealed  or
design does not cater to load
deliberate deviant practices
situations and boundary tests. For
coming to the fore. Thus, while staff
normal and rural-based clients it is
may pay lip service to the software,
difficult to distinguish between
in reality may go slow or even
normal test and load test.
sabotage it. This calls for courage
and maturity on the part of the MFI
as it has to take the staff along,
4.
Inadequate Articulation and
explaining the potential benefits of
Documentation of Requirement
automation while rectifying the
mistakes revealed and taking
Proper articulation is often very
corrective action.
difficult because requirement itself
is dynamic in nature, especially in
Useful Practices in Computerisation
the changing market economy.
Therefore, it is advisable to
articulate sub-system wise. This
1.
System Study and Analysis
means that different sub systems of
the operating systems need to be
A  systematic  approach  is
defined  systematically  and
important when initiating the
separately. The requirement should
process of automation. The first
be divided into two parts ­ main
step is to study the system and
and basic requirements and then
analyse it. This process needs to be
sub-system wise. In the second
done by the client so that the
round the detailed requirement
operating process is streamlined.
should be taken sub-system wise.
System analysis is carried out after
system study. The analysis is used
5.
Longevity of Manual Systems
to clearly define all the processes
­ i) ones that will remain manual
Any dilution in the
and ii) ones that are to be
Manual systems continue for a long
process has
automated.  Different people
time even after automation is
implications and
introduced because staff fear
follow different approaches. After
could lead to
the system study and analysis, one
making mistakes. The change to full
inaccuracies and
delay in
needs to prepare a process-flow
automation is a painful transition.
implementation
Organisations are often not ready
diagram with its use case, activity
and trigger (clearly marking the
and therefore care is required from
processes that will remain manual
both sides ­ vendor as well as
client.
and ones that will be automated).
It is very useful if the study is carried
out by a team drawn from both the
6.
Issues with Software
vendor and client. Any dilution in
the process has implications and
Every software requires patient
could lead to inaccuracies and
handling. There are bound to be
delay in implementation.
glitches of all sorts, which will only
be revealed once the MFI staff
2.
Outsourcing Project Management
starts using the software. The
vendor can solve and refine the
software only with the cooperation
Since MFIs do not have an
of the users. It is akin to a horse-hoe
understanding of system study and
computerisation, it is a good idea
­ painful when first fitted but once
broken in, enables the horse to
to
outsource
project
gallop with ease. Similarly, MFI staff
management. There are many
organisations which take on the
will face problems at the time of
adopting the software but once
job. People who have experience
comfortable with the technology,
in microfinance and software
development are better suited for
find that it eases the work pressure.
this. The role of a project manager
is to first understand the users'
7.
Issues  of  Transparency
and
requirement and identify a suitable
Accountability
vendor
and
software
for
implementation.  The  project